Reliability Analysis for Rotary Feeder 561 BF 1 at PT Semen Bosowa Banyuwangi
DOI:
https://doi.org/10.14421/icse.v3.516Keywords:
Maintenance Management, Reliability, Equipment, Running Hours, Corrective MaintenanceAbstract
Maintenance is an important activity in a manufacturing company. This paper focuses on reliability analysis for Rotary Feeder 561 BF 1 at PT Semen BosowaBanyuwangi. Mean Time to Failure and Reliablity were calculated. We concluded thatreliability at running time 240 hours or 10 days is 99.33%, while reliability damage at running hours 1920 hours or 80 days is 60.48% therefore before running hours 1920 equipment and materials need to be prepared for corrective maintenance.
Downloads
Download data is not yet available.
Downloads
Published
2020-04-30
How to Cite
Fauzi, R. ., & Pramudyo, C. S. . (2020). Reliability Analysis for Rotary Feeder 561 BF 1 at PT Semen Bosowa Banyuwangi. Proceeding International Conference on Science and Engineering, 3, 297–300. https://doi.org/10.14421/icse.v3.516
Issue
Section
Articles